Shipping containers (運輸集裝箱) are now used widely in Bangladesh. Many construction companies using shipping containers for various reasons as they have many benefits. But if anyone have short budget, but need a container then they could buy used shipping container (二手運輸集裝箱). Using shipping containers people are building many structures, including container office building, shipping container […]
VIEW MOREBlog
Human’s creativity knows no bounds. Mankind has transformed uncountable objects designed for one purpose into something totally different. Repurposing is an ingenious way to use old things and is critical for extending the life of important construction materials. Do you think about your next project will be on a shipping container? At present shipping containers […]
VIEW MORENowadays shipping container office building (集裝箱辦公大樓) has been so popular. People are waking up to the reality of climate change. Cheaper, more sustainable building methods will be top priority in the coming decade. That coupled with the fact there has been a massive shift to working from home, the future is shipping containers (運輸集裝箱). Basically […]
VIEW MOREA water stopper is a material embedded in the concrete, with the singular purpose to obstruct the passage of water through the joint. It is designed for growth or contraction joint; in the meantime, it will accommodate lateral and cross movements that create it capable to suit the moving joints. The PVC water stopper is […]
VIEW MOREPrefabricated Vertical Drains additionally referred to as Wick Drains or band drains are prefabricated geotextile filter-wrapped plastic strips with wrought channels. These act as drainage paths to require pore water out of soft compressible soils that consolidate faster under a constant surcharge load. Prefabricated vertical drains are used for settlement method and to increase the […]
VIEW MORETechnical Specifications Awarding Authority: SASEC-II (WP10) Work: 180 Meter per Bridge Temporary Retaining Wall Material Used: Steel Pipe Bridge Piling Depth: 12 Meters Construction Duration: 40 Days
VIEW MORETechnical Specifications Awarding Authority: Local Government Engineering Department Size: 9 Km Road with 4 nos Culverts Construction Duration: 12 Months
VIEW MORETechnical Specifications Awarding Authority: Bangladesh Economic Zone Authority Size: 18 Km Road with 2 nos Bridges Construction Duration: 18 Months
VIEW MORETechnical Specifications Awarding Authority: Payra Port Authority Size: 390 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 21 Meters, Pipe- 20-40 Meters Construction Duration: 70 Days
VIEW MORETechnical Specifications Awarding Authority: Shandong Water Conservancy Construction Ltd. Work: 90 Meter Project Access road with 12 Meter Steel Bridge. Material Used: Steel Pipe, H/ I Beams, Checkers Plate Bridge Piling Depth: 20 Meters