Project-Access-Bridge-and-Road-for-Water-Treatment-Plant-(Narayanganj)

Project Access Water Treatment Plant For Bridge And Road

Technical Specifications

Awarding Authority: Shandong Water Conservancy Construction Ltd.
Work: 90 Meter Project Access road with 12 Meter Steel Bridge.
Material Used: Steel Pipe, H/ I Beams, Checkers Plate
Bridge Piling Depth: 20 Meters