Completed Projects

400 Square Meter Jetty at Barisal Power Plant

  • Awarding Authority: Power China Harbor
  • Construction Duration: 53 Days

Details
300 Square Meter Jetty at Barisal Power Plant

  • Awarding Authority: Power China Harbor
  • Size: 300 Square Meter
  • Construction Duration: 60 Days

Details
Retaining Piling for Padma Bridge Railway Link Project

  • Awarding Authority: Dong Shue Construction Ltd.
  • Construction Duration: 30 Days

Details
6 Nos Temporary Bridge Retaining Wall for Rangpur 4 Lane

  • Awarding Authority: SASEC-II (WP10)
  • Work: 180 Meter per Bridge Temporary Retaining Wall
  • Construction Duration: 40 Days

Details

Running Projects

390 Square Meter Temporary Jetty at Payra Port

  • Awarding Authority: Payra Port Authority
  • Size: 390 Square Meter
  • Construction Duration: 70 Days

Details

Upcoming Projects

18 KM Road at Mirsarai economic Zone in BEZA

  • Awarding Authority: Bangladesh Economic Zone Authority
  • Construction Duration: 18 Months

Details
Re-construction of 9 Km Road with 4 culverts Repair Work at Gopalganj Under LGED

  • Awarding Authority: Local Government Engineering Department
  • Construction Duration: 12 Months

Details