Technical Specifications Awarding Authority: Local Government Engineering Department Size: 9 Km Road with 4 nos Culverts Construction Duration: 12 Months
VIEW MORETechnical Specifications Awarding Authority: Local Government Engineering Department Size: 9 Km Road with 4 nos Culverts Construction Duration: 12 Months
VIEW MORETechnical Specifications Awarding Authority: Bangladesh Economic Zone Authority Size: 18 Km Road with 2 nos Bridges Construction Duration: 18 Months
VIEW MORETechnical Specifications Awarding Authority: Payra Port Authority Size: 390 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 21 Meters, Pipe- 20-40 Meters Construction Duration: 70 Days
VIEW MORETechnical Specifications Awarding Authority: Shandong Water Conservancy Construction Ltd. Work: 90 Meter Project Access road with 12 Meter Steel Bridge. Material Used: Steel Pipe, H/ I Beams, Checkers Plate Bridge Piling Depth: 20 Meters
VIEW MORETechnical Specifications Awarding Authority: Dong Shue Construction Ltd. Work: 3000 Square Meter Steel Piling Drive Material Used: Sheet Pile, H/I Beams Piling Depth: 6-9 Meters Construction Duration: 30 Days
VIEW MORETechnical Specifications Awarding Authority: Power China Harbour Size: 300 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 18 Meters, Pipe- 20 Meters Construction Duration: 60 Days
VIEW MORETechnical Specifications Awarding Authority: Power China Harbour Size: 400 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 21 Meters, Pipe- 20-40 Meters Construction Duration: 53 Days
VIEW MOREGlass has been a fascinating material to humankind since it was first made in about 500 BC. At first, thought to possess magical properties, glass has come a long way. It is one of the most versatile and oldest materials in the building industry. Glass is now being used in the building industry as insulation […]
VIEW MOREAn incomplete building is a building (or other architectural structure, as a bridge, a road, or a tower) where construction work was abandoned or on-hold at some stage or only exists as a design. It may also refer to buildings that are currently being built, particularly those that have been delayed or at which construction […]
VIEW MOREA dredge is defined as an apparatus used for an excavation activity that is carried out at least partially or fully submerged underwater, with the purpose of gathering up bottom sediments and disposing of them at a different location. Dredging, as a process, is used to remove the deposits percolated underwater for the purpose of […]
VIEW MORE