6 Nos Temporary Bridge Retaining Wall For Rangpur 4 Lane

Technical Specifications

Awarding Authority: SASEC-II (WP10)
Work: 180 Meter per Bridge Temporary Retaining Wall
Material Used: Steel Pipe
Bridge Piling Depth: 12 Meters

Construction Duration: 40 Days