Retaining Piling For Padma Bridge Railway Link Project

Technical Specifications

Awarding Authority: Dong Shue Construction Ltd.
Work: 3000 Square Meter Steel Piling Drive
Material Used: Sheet Pile, H/I Beams
Piling Depth: 6-9 Meters
Construction Duration: 30 Days

SIMEX Bangladesh is a leading infrastructure and engineering company specializing in marine works, deep foundations, steel structures, and large-scale civil projects.