Technical Specifications Awarding Authority: SASEC-II (WP10) Work: 180 Meter per Bridge Temporary Retaining Wall Material Used: Steel Pipe Bridge Piling Depth: 12 Meters Construction Duration: 40 Days
VIEW MORECategory: Completed Projects
Technical Specifications Awarding Authority: Shandong Water Conservancy Construction Ltd. Work: 90 Meter Project Access road with 12 Meter Steel Bridge. Material Used: Steel Pipe, H/ I Beams, Checkers Plate Bridge Piling Depth: 20 Meters
VIEW MORETechnical Specifications Awarding Authority: Dong Shue Construction Ltd. Work: 3000 Square Meter Steel Piling Drive Material Used: Sheet Pile, H/I Beams Piling Depth: 6-9 Meters Construction Duration: 30 Days
VIEW MORETechnical Specifications Awarding Authority: Power China Harbour Size: 300 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 18 Meters, Pipe- 20 Meters Construction Duration: 60 Days
VIEW MORETechnical Specifications Awarding Authority: Power China Harbour Size: 400 Square Meter Material Used: NS-SP II Sheet Pile, Steel Pipe, Steel Plates, H Beam Piling Depth: Sheet Pile- 21 Meters, Pipe- 20-40 Meters Construction Duration: 53 Days